DiecastXchange Forum banner
1 - 9 of 9 Posts
G

·
Discussion Starter · #1 ·
The changes between a gen 1 RT/10 and gen 2 RT/10 are subtle. Can you pick out the differences?







Putting one of these together is quite the process taking about 2 weeks to complete requires both an RT/10 and GTS to cut up to make 1 car as the facia and hood are needed to complete the look.
 
G

·
Discussion Starter · #4 ·
the facia and hood had to be swapped which meant it had to be completely cut off the GTS and reattached. I cut the roof off the GTS to make a hardtop and had to fill in the side sills with bondo as there were large cutouts for the sidepipes.

The stripes are painted on.
 
1 - 9 of 9 Posts
Top